Culture of Making - Plan A

From TTU College of Architecture

Jump to: navigation, search

2 May 2013
Submited by Chris Taylor

PLAN A - Expansion into North Courtyard

Plan A Overview Plan A Overview- PDF

Detail Plan A North Detail Plan A North- PDF

Detail Plan A South Detail Plan A South - PDF

  • Expand architecture building into north courtyard to capture largest roof area possible and create high bay work area.
  • Construct trolley crane from new Flint Ave truck loading zone through courtyard work areas to enable large scale work.
  • Reconfigure retaining wall at north courtyard to maximize usable work areas in north courtyard.
  • Move Wood and Metal shops to north end of building creating more productive and safer machinery arrangement and use.
  • Move Model shop to south end of building.
  • Occupy room 7 for CNC/Robot shop.
  • Use small gallery for 3D Print shop.
  • Expand storage.
  • Construct exterior clean finish room south of building.


PLAN A - Area Summary

Space Area (sq. ft) note
Existing Wood Shop1,658
Existing Metal Shop800
Existing Model Shop2,742
Existing Storage221
Total Exist. conditioned area5,200
Total Exist. Storage221
Total Exist. Shop area5,421
---
New Wood Shop1,658
New Metal Shop1,600
New Common Area1,072
New Model Shop1,658
New CNC / Robot Shop1,000
New 3D Print Shop325
New Storage1,021
New Covered Exterior Fabrication area1,180
New Finishing Room320
New Exterior Fabrication area 12,653
New Exterior Fabrication area 22,600
---
Total New conditioned area7,31341%gain
Total New Storage area1,021
Total New Unconditioned area1,500
Total New Exterior Fab. area5,253
Total New Shop area15,087178%gain



Culture of Making Committee